You are missing some Flash content that should appear here! Perhaps your browser cannot display it, or maybe it did not initialize correctly.
LEED Projects
We are proud to have been involved with some of the first projects to qualify for LEED Certification.
Genzyme Headquarters — The First LEED Office Building
"The Platinum certification confirms Genzyme Center's status as one of the most environmentally responsible buildings in the country," said Rich Fedrizzi, president, CEO and founding chair of the US Green Building Council. Products Used: Glass Entrance, Laminated Glass, Insulating Glass
Spertus Institute — LEED Silver Rating
The Curtain Wall provided by Oldcastle Glass® reflects the latest advances in material engineering, creating a customized four-side silicone system for this 155,000 square-foot structure. Product used: Custom-engineered Curtain Wall
111 South Wacker — The First LEED Gold Core and Shell
111 South Wacker designed by Goettsch Partners is the first building to win LEED-CS (Core and Shell) Gold certification for the US Green Building Council. Product used: Custom-engineered, Curtain Wall
Signature Center — LEED Platinum Certification
Designed to the highest standards of sustainability, the Signature Center received a Platinum Rating, LEED's highest honor. Product used: Solar Control Glass
